Main Control Cubicle (MCC) Cotter Water Pumping Station (ACTEW)

As part of the ACT Water Security Strategy, the Bulk Water Alliance (ACTEW, John Holland, Abigroup, GHD) engaged Ecowise Services to undertake the design, supply and installation of the new High Voltage (2.75kV) MCC in the Cotter Raw Water Pumping Station. The project had the usual challenges.


First, a tight timetable for design and construct.


Second, the site was a heritage building from a completely different era, meaning the MCC needed to traverse very tight installation corridors.


Third, the project needed to work around a station that continued to operate throughout the works.

Our other projects.

02 Nov, 2023
Ecowise Services was engaged to undertake early assembly and refinement of the major prototype building blocks, including most of the elements of internal fitout (ie trunk data circuits, all power elements, container interconnection and UPS/Rack final mounting).