Ecowise Services is a trusted ACT & SE NSW leader in commercial and industrial electrical contracting services. With a focus on excellence and commitment to quality, we offer an extensive range of services to meet all of your electrical needs. Our dedicated team of professionals ensure that your projects are handled with precision and care at every stage. 

OUR PROJECTS

Electrical Contracting Projects

23 Oct, 2023
This project has delivered a safer pedestrian environment and access via a one-way shared zone between Gungahlin Place and Gozzard Street. The improvements to Hibberson Street will mean more people spend time here instead of just walking through. It was important to maintain vehicle access along the street to provide access for businesses, people with disabilities and to ensure safety at night. The project delivered: A more comfortable, safe and vibrant space with greater potential for economic activity in Canberra's fastest growing region. Broader pedestrian verges, with improved landscaping, more trees and places to sit and relax under the shade. A safer pedestrian focussed streetscape, with reduced vehicle speeds, one-way travel (from Gungahlin Place to Gozzard Street) and the introduction of slow points along the length of road. Upgraded and safer pedestrian crossings. On-street parking, disabled parking and bike racks.
23 Oct, 2023
Blundells Cottage is an original 1860’s workers cottage. Ecowise Services worked with RAM constructions to install architectural lighting to highlight the buildings significance and history.
23 Oct, 2023
The project has completely transformed the West Basin area of Lake Burley Griffin. The project incorporates a boardwalk with area lighting, seat feature lighting and Griffin Marker light (marking the line for Walter Burley Griffins original water axis from Black Mountain to the formal central lake).
23 Oct, 2023
Installation and termination of high voltage cables as a specialised contractor.
23 Oct, 2023
Ecowise Services was engaged as the Electrical Contractor to convert the roundabout to a functional set of traffic signals. The project involved liaison with Transport for NSW and Essential Energy for the installation of Traffic Signals and Streetlights as part of the modification.
23 Oct, 2023
Installation of traffic signals and streetlighting for the Northern portion of John Gorton Drive. This is an important link road and a needed upgrade on the previous Coppins Crossing Road for the expanding suburbs of Molonglo, in particular Whitlam and Denman Prospect.
23 Oct, 2023
Ecowise Services has been been engaged since stage 1 of the project in 2013 and completed the rollout out of all high and low voltage electrical infrastructure for the subdivision – Padmount substations, pillars, streetlights.
23 Oct, 2023
Denman Prospect is home to over 2000 new residents in the Molonglo Valley. Ecowise Services has been engaged across multiple stages to provide traffic signals and streetlighting infrastructure.
23 Oct, 2023
Ecowise Services provided streetlighting and traffic signals installation and modification works as part of the Cotter Road duplication to assist with traffic movement for the new residents of the Molonglo Valley.
23 Oct, 2023
Ecowise Services was engaged for the installation of high and low voltage electrical infrastructure for the subdivision – Padmount substations, commercial pillars, streetlights and traffic signals.
23 Oct, 2023
Road and feature lighting for the Bebo Bridge Googong.
23 Oct, 2023
Ecowise Services provided streetlighting and traffic signals installation and modification works as part of the Aikman Dr Duplication to assist with traffic movement in the Belconnen Town Centre.
07 Oct, 2023
The conversion of the existing roundabout to a functional set of traffic signals is unique to the ACT and this is regarded as the most complex traffic signal installation in the ACT.
07 Oct, 2023
This is the largest roadway project completed in the ACT. This road network around the Canberra Airport is one of the most congested areas of roadway in the ACT, and the works involved progressive staging to keep the roads functioning throughout. This project involved the installation of 472 streetlights and 5 complete traffic signals sets.
06 Oct, 2023
This was one of the largest infrastructure projects in the ACT in 2009, involving tight timetables. This road network around the Canberra Airport is one of the most congested areas of roadway in the ACT, and the works involved progressive staging to keep the roads functioning throughout.
06 Oct, 2023
Ecowise Services was awarded the electrical (powerline) reticulation of this estate.
06 Oct, 2023
Ecowise Services was awarded the bulk relamp of arterial roadway for a segment of the ACT Government’s streetlighting portfolio.
06 Oct, 2023
Part of the needs of the Bulk Water Alliance was a high speed communications circuit to support the remote major construction sites. Ecowise Services was contracted to design, supply and install the fibre optic circuit.
06 Oct, 2023
As part of the ACT Water Security Strategy, the Bulk Water Alliance (ACTEW, John Holland, Abigroup, GHD) engaged Ecowise Services to undertake the design, supply and installation of the new High Voltage (2.75kV) MCC in the Cotter Raw Water Pumping Station. The project had the usual challenges. First, a tight timetable for design and construct. Second, the site was a heritage building from a completely different era, meaning the MCC needed to traverse very tight installation corridors. Third, the project needed to work around a station that continued to operate throughout the works.